顯示具有 Design 標籤的文章。 顯示所有文章
顯示具有 Design 標籤的文章。 顯示所有文章

2008年12月7日 星期日

Cindy's Wedding Cake

017

This is my first time making a wedding cake. Thank Cindy for giving me this opportunity. It took me 1 1/2 days to finish this cake. The cake is vanilla flavor with various fruit mousse fillings. (strawberry, apple, and mango) No one would know what kind of flavor they were going to have.

018 Another closer picture. Thanks Edison for taking pictures for me. For my blog visitors, if you took any picture for this cakes, please send me an e-mail. Really appreciate....

2008年8月30日 星期六

Cakes for Cindy's Bridal Shower

P8300023

This is for Cindy's Bridal Shower.

 

P8300025

2008年7月31日 星期四

Cake Decorating Course III --- Final Cake (Tiered Cake)

P7310555

P7310558

This it another one I made today. The top cake is filled w/ strawberry mousse and the bottom one is filled w/ mango mousse.

I hope the cake won't taste bad....

Sabrina, don't forget to stay a little bit longer tomorrow night for tasting this cake ah... smile_wink

2008年7月12日 星期六

Bridal Shower Cake for Cherry....

P7120517

I was planning to bake a one layer cake for Cherry's bridal shower.

However, Joseph suggested me to do two layers instead since I have enough filling.

It is Taiwanese cake with pudding and taro fillings.

I don't know if this would taste good...

I'm still bad at icing the cake. You can see there're lots of spaces are not smooth....smile_sad

糖花 (Has to been made at least 24 hrs ahead.)

P7110509P7110511

First Layer

P7120519

Second Layer

P7120515

2007年11月5日 星期一

Designing Floor...

I found a good website to estimate the amount of tiles we need.

This is the one I like.

However, I want it a little bit different so I drew this one.

This is our utility room. The black line on the top left is door.

W stands for washer and D stands for dryer.

The floor will be like this one. The contractor will put "Texas Beige" tiles on the purple areas and "Canyon" tiles on the small white areas.

Hope this will look good...(It'd better look good... the contractor charges us $200 more for this extra job...money)